CNC / Turning machine factory
Metal Machining parts:
Material : copper, brass, bronze, steel, aluminum, stainless steel,etc.
Production method: Automatic lathing, CNC lathing , CNC milling, CNC drilling, CNC boring, CNC grinding
Surface finish: electroplate, anodizing, powder coating, painting, silk screen, etc.
Production equipment list: 15 precision CNC lathing, 10 precision CNC milling, 30 other machines
Production capacity
Tolerance: +/-0.001mm
Environmental requirement: RoHs
Lead time: 7-35days
Stamping machine factory
Metal Stamping parts:
Design and manufacture tooling & dies in house.
Material : copper, brass, bronze, steel, aluminum, stainless steel,etc.
Production method: progressive die, single die, stage tool
Surface finish: electroplate, anodizing, powder coating, painting, silk screen, etc.
Production equipment list: machine tonnage 25T-1000T 25 machines in total.
Production capacity
Tolerance: +/-0.01mm
Environmental requirement: RoHs
Lead time: 15-35days